Season: 4 | Episode: 2 | Length: 30m
Engineer Tim Joyce retraces the major engineering works that transformed the River Shannon into a navigable waterway. Visiting locations including Clonahenogue Canal, Victoria Lock and Meelick Weir, Tim uncovers both the ingenuity and miscalculations behind these ambitious projects.